CALAX Subsection 1: Kawit Interchange to Boost Connectivity in Cavite
A gigantic infrastructure project is underway in Cavite, with the CALAX subsection 1, also known as the Kawit interchange, expected to be completed by the third quarter of 2025. This 8.68-kilometer stretch will connect the open canal area in Imus…